Fixing your oak flooring correctly is essential to how it looks and how long it lasts. Here are our tips for getting the best results.
Before you start
Oak flooring must be kiln dried so that its moisture content suits a heated interior. It should also be fully acclimatised to the room before fixing. Read more in our article Acclimatising Oak Flooring.
■ Is the sub floor dry?
Moisture in the subfloor is one of the most common causes of flooring failure. If it reaches the oak, the boards will swell and can cup or lift.
Concrete and screed subfloors: Moisture can rise from the ground, and new screeds also hold a large amount of water from construction, which can take many weeks or months to dry out. A damp proof membrane (DPM) beneath the slab will not stop moisture already in the screed. Test the screed’s relative humidity (RH) with a hygrometer before laying. We recommend it does not exceed 70% RH, and you should also follow the limits set by your adhesive and DPM manufacturer. If you are in any doubt, apply a surface DPM such as Marldon Rapid DPM MXS140.
Timber subfloors and joists: Check the moisture content of the subfloor or joists with a moisture meter. If there is a void beneath the floor, make sure it is well ventilated.
■ Allowing for movement
Oak flooring will always move a little with the seasons. In summer, when the air is more humid, it takes up moisture and swells slightly. In winter, when heating dries the air, it shrinks slightly, and small gaps between boards are normal.
Leave an expansion gap of 12–15mm around the whole floor, including around pipes, architraves, doorways and any other fixed objects. This gap is usually hidden under skirting boards or a trim. Large or wide rooms may need a bigger gap or expansion joints, so ask our team if you are unsure.
■ Fixing the flooring
Onto concrete or screed: We recommend gluing the flooring with a flexible adhesive such as Marldon MXA200 Trowelled Adhesive, which allows for the natural movement of the oak. It can be applied directly over Marldon Rapid DPM MXS140.
Onto joists: Solid boards can be secret nailed through the tongue or fixed with flooring screws. Make sure the boards are thick enough for the joist spacing.
Floating installation: Engineered flooring can be laid as a floating floor over a suitable underlay, without being fixed to the subfloor. Follow the manufacturer’s guidance.
■ Underfloor heating
Check that your flooring is suitable for use with underfloor heating before ordering.
Commission and run the heating system before the floor is laid.
Make sure the heating pipes are installed as specified by the heating system manufacturer, either fully embedded in the screed or fitted in spreader plates, so that no part of the floor overheats.
The surface temperature of the flooring must never exceed 23°C at any point.
Turn the heating on and off gradually at the start and end of each heating season, so the flooring has time to adjust.
■ Finishing the flooring
There are two main types of finish for oak flooring.
Oil soaks into the wood to give a natural look. Hardwax oils such as Osmo Polyx Oil also form a thin protective layer at the surface, making them more hardwearing. Light scratches and worn areas can be repaired by cleaning the area and applying more oil, though deeper scratches will need sanding first. Oiled floors need regular maintenance.
Lacquer forms a protective layer on top of the wood, giving a clean, sealed finish that resists dirt and spills well. However, scratches are harder to repair, and worn areas usually need sanding and re-lacquering.
View our range of adhesives & finishes here.